Assist Phase II Enhanced Vapor Recovery System VR-201 Revision AE
Contact
Assist Phase II Vapor Recovery System - (Renewed November 30, 2023)
Legal | |
---|---|
Equipment List | |
System Specifications | |
Manufacturing Performance Standards and Specifications | |
Determination of Static Pressure Performance of the Healy Clean Air Separator | |
Vapor to Liquid Volume Ratio | |
Manufacturer Warranties | |
Nozzle Bag Test Procedure | |
Required Items in Conducting TP-201.3 | |
Liquid Condensate Trap Compliance Test Procedure | |
Exhibit 10 | This section left intentionally blank |
Exhibit 11 | This section left intentionally blank |
Veeder-Root Maintenance Tracker (Optional) | |
Below-Grade Vaulted Tank Configuration | |
Exhibit 14 | Dispenser Integrity Test |
Exhibit 15 | ARID Technologies AT-150 Permeator Compliance Test Procedure |
Until documents have been posted, please contact vapor@arb.ca.gov for electronic versions
Superseded
Assist Phase II Enhanced Vapor Recovery System - Without ISD
- Signed Executive Order VR-201-AD
- Signed Executive Order VR-201-AC
For questions regarding associated Exhibits, IOMs, and letters listed below, please email vapor@arb.ca.gov for current versions:
Legal Document | |
---|---|
Equipment List | |
System Specifications | |
Manufacturing Performance Standards and Specifications | |
Determination of Static Pressure Performance of the Healy Clean Air Separator | |
Vapor to Liquid Volume Ratio | |
Manufacturer Warranties | |
Nozzle Bag Test Procedure | |
Required Items in Conducting TP-201.3 | |
Liquid Condensate Trap Compliance Test Procedure | |
Exhibit 10 | This section left intentionally blank |
Exhibit 11 | This section left intentionally blank |
Veeder-Root Maintenance Tracker (Optional) | |
Below-Grade Vaulted Tank Configuration | |
Dispenser Integrity Test | |
ARID Technologies AT-150 Permeator Compliance Test Procedure |
For copies of the individual IOM and superseded versions, please contact vapor@arb.ca.gov.
Installation, Operation and Maintenance Manual (IOM)
Superseded Revisions
- Superseded VR-201-AB (placeholder)
- Superseded VR-201-AA
- Superseded VR-201-Z
- Superseded VR-201-Y
- Superseded VR-201-X
- Superseded VR-201-W
- For copies of revisions A through V, please email vapor@arb.ca.gov
March 18, 2015 Letter to Franklin Fueling Systems and Veyance Technologies requiring the use of EVR certified low permeation replacement hoses for Assist Phase II EVR systems.
Fillboard Nozzle Advertisement Product
August 1, 2012 letter to allow over media for Healy 900 nozzles.
New EasyGrip Reconnection Clamp
July 14, 2011 Letter to GA Ninety to use the EasyGrip reconnection clamp to reconnect the Healy 8701VV Breakaway
Modified Healy 795 Reconnection Clamp
June 22, 2011 Letter to Franklin Fueling Systems to implement design change to the Healy 795 Reconnection Clamp
ARB Letter
Franklin Fueling Systems Request for Spout Modification, New Spout Epoxy and Epoxy Curing Procedure.
900 EVR Nozzle and VP-1000 Design Modifications
January 23,2009 Letter to Franklin Fueling Systems to implement design changes to model 900 EVR nozzle and VP-1000 vacuum pump.
Clean Air Separator Paint Colors
August 2, 2007 letter clarifying that the Healy Clean Air Separator may be painted any color.
ARB Letter
Franklin Fueling Systems Request to Use New Vendor for Their Model 900 EVR Nozzle Casting.
Correspondence related to VR-201
April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law.
VP-1000 Design Improvements
September 18, 2007 Letter to Franklin Fueling Systems to implement VP-1000 design improvements.