Executive Order Morrison Brothers Phase I Enhanced Vapor Recovery (EVR) System for Aboveground Storage Tanks (AST)
Contact
Vapor Recovery Program
Email
VR-402 Revision G (signed November 8, 2023)
- VR402 - G Legal Language
- VR-402-G Exhibits:
- Exhibit 1 Equipment List
- Exhibit 2 Installation, Maintenance, and Compliance Standards and Specifications
- Exhibit 3 Manufacturing Performance Standards and Specifications
- Exhibit 4 Manufacturer Warranty
- Exhibit 5 Alternate Phase I EVR Installation Configurations for Existing Aboveground Storage Tank
- Exhibit 6 Determination of Static Pressure Performance of Vapor Recovery Systems at Gasoline Dispensing Facilities with Aboveground Storage Tanks
- VR-402-G Installation, Operation, and Maintenance Manual (IOM) for the Morrison Brothers Phase I System
Superseded Versions
- VR-402-F Legal Language
- VR-402-F Modification Highlights
- VR-402-E Exhibits:
- Exhibit 1 Equipment List
- Exhibit 2 Installation, Maintenance, and Compliance Standards and Specifications
- Exhibit 3 Manufacturing Performance Standards and Specifications
- Exhibit 4 Manufacturer Warranty
- Exhibit 5 Alternate Phase I EVR Installation Configurations for Existing Aboveground Storage Tank
- Exhibit 6 Determination of Static Pressure Performance of Vapor Recovery Systems at Gasoline Dispensing Facilities with Aboveground Storage Tanks
- VR-402 Installation, Operation, and Maintenance Manual (IOM) for the Morrison Brothers Phase I System
For questions on associated documents and superseded versions, please contact vapor@arb.ca.gov.
Documents
VR-402-Rev G Exhibit 1
VR402G-EX1.PDF · 2.459 MB
VR-402-Rev G Exhibit 2
VR402G-EX2.PDF · 2.822 MB
VR-402-Rev G Exhibit 3
VR402G-EX3.PDF · 116 KB
VR-402-Rev G Exhibit 4
VR402G-EX4.PDF · 1.584 MB
VR-402-Rev G Exhibit 6
VR402GEX6.PDF · 238 KB
VR 402 Revision G Exhibit 5
VR402G_EX5.PDF · 1.205 MB
VR 402 Revision G Legal Language
VR402G_LGL.PDF · 128 KB