LCFS ZEV Infrastructure Crediting
Categorías
Background
The 2018 LCFS amendments added a zero emission vehicle (ZEV) infrastructure crediting provision to the LCFS (section 95486.2) designed to support the deployment of ZEV infrastructure. The ZEV infrastructure provision covers Hydrogen Refueling Infrastructure (HRI) and Direct Current (DC) Fast Charging Infrastructure (FCI). In addition to generating LCFS credit for dispensed fuel, the eligible hydrogen station, or DC fast charger can generate infrastructure credits based on the capacity of the station or charger minus the quantity of dispensed fuel.
Zero Emission Vehicle Infrastructure Crediting Overview (August 19, 2021)
Application Materials and Instructions
- HRI Application Template (February 11, 2019)
- Application Instructions for Hydrogen Refueling Infrastructure Pathway (updated August 21, 2020)
- New FCI Application Template (January 5, 2024): This template does not use macros
Approved HRI and FCI Applications
As of May 24, 2024, there have been a total number of 686 and 74 stations approved under the FCI and HRI provisions, respectively. The number of chargers in the approved stations adds up to a total of 4,213 for FCI provision versus 157 for HRI provision.
- FCI Approved Applications (May 24, 2024)
- HRI Approved Applications (May 24, 2024)
Below are maps of all 74 hydrogen stations and 686 fast EV charger sites approved under HRI and FCI, respectively.
Estimated Potential HRI and FCI Credits
As per the LCFS regulation, the HRI and FCI applications can be approved until estimated potential HRI and FCI credits from all approved applications do not exceed 2.5 percent of deficits in the prior quarter, respectively. The table below shows estimated potential HRI and FCI credits based on prior quarter deficits and will be updated quarterly.
Table updated: August 22, 2024
Total deficits generated in Q4 2023 | 5,695,049 |
2.5% limit based on Q4 2023 deficits | 142,376 |
Estimated Potential HRI Credits | 73,606 |
Estimated Potential FCI Credits | 31,730 |
Percentage of FCI FSEs at FCI sites with summed power >2,500 kW | 9.8% |