2018 Mobile Source Mailouts
Contact
Below is a list of the 2018 mailouts for the Mobile Source Control Division and Emissions Compliance, Automotive Regulations and Science Division. Although these documents may reside in various locations of the website, the goal is to ensure that all mailouts reside in this area in chronological order.
Sign up to the new Mobile Source Mailouts and Manufacturers Advisory Correspondence (MAC) list server. By doing this, you will be notified when a new Mobile Source Mailout or MAC has been posted to the Mobile Source Mailouts or MAC webpages. These email notices can replace any of the mobile source hard copy mailing lists you may already be on. If you subscribe to the ms-mailings list serve, you may wish to delete your subscription to the hard copy lists by notifying the Webmaster.
Mobile Source Control Division
Mailout # | Subject |
---|---|
MSC 18-23 | Public Workshop to Discuss Potential Changes to the Heavy-Duty Engine and Vehicle Emission Standards, Test Procedures, Warranty, and Other Related Heavy-Duty Programs (95KB) |
MSC 18-22 | Heavy-Duty Advanced Technology Incentives Public Work Group Meeting (76KB) |
MSC 18-21 | Public Workshop on the Funding Agricultural Replacement Measures for Emission Reductions (FARMER) Program (110KB) |
MSC 18-20 | Grant Solicitation for the Financing Assistance for Lower-Income Consumers Pilot Project (105KB) |
MSC 18-19 | Public Workshop on the Update to the Three-Year Plan for Light-Duty Vehicle and Transportation Equity Investments |
MSC 18-18 | |
MSC 18-17 | Public Workshop to Discuss Proposed Amendments to the Solid Waste Collection Vehicle Regulation Including Phase-In Requirements for Single-Engine Heavy Cranes (84KB) |
MSC 18-16 | Fourth Public Workshop to Discuss Proposed Heavy-Duty Zero-Emission Powertrain Certification Procedures (ZEP CERT) (226KB) |
MSC 18-15 | Public Workshop to Discuss the Proposed Innovative Clean Transit Regulation (248KB) |
MSC 18-14 | Public Workshop on Development of the Fiscal Year 2018-19 Funding Plan for Clean Transportation Incentives |
MSC 18-13 | Public Workshop to Discuss a Regulation to Accelerate Deployment of Zero-Emission Airport Ground Support Equipment (82KB) |
MSC 18-12 | Fiscal Year 2017-19 One-Stop-Shop Pilot Project Grant Solicitation |
MSC 18-11 | Public Workshop to Discuss the Proposed Advanced Clean Trucks Rule (78KB) |
MSC 18-10 | Fiscal Year 2017-18 Zero- and Near Zero-Emission Freight Facilities Project Solicitation |
MSC 18-09 | Third Public Workshop to Discuss Proposed Certification Procedures for Medium-Duty, Heavy-Duty, and Off-Road Zero-Emission Powertrains and Vehicles (Zero-Emission Powertrain Certification) (250KB) |
MSC 18-08 | Agricultural Worker Vanpools Pilot Project Grant Solicitation |
MSC 18-07 | Public Workshop on Development of the Fiscal Year 2018-19 Funding Plan for Clean Transportation Incentives |
MSC 18-06 | New Incentive Funds to Reduce Emissions in Assembly Bill 617 Communities: Invitation to Participate in Public Workshops (342KB) |
MSC 18-05 | Public Workshops to Discuss Zero-Emission Airport Shuttle Bus (ASB) Measure (254KB) |
MSC 18-04 | Second Public Workshop to Discuss Proposed Certification Procedures for Medium-Duty, Heavy-Duty, and Off-Road Zero-Emission Powertrains (Zero-Emission Powertrain Certification) (246KB) |
MSC 18-03 | Two Additional Public Workshops on the Funding Agricultural Replacement Measures For Emission Reductions (FARMER) Program Guidelines: Discussion Document (398KB) |
MSC 18-02 | Public Workshop on Developing A Beneficiary Mitigation Plan for California's Allocation of the Volkswagen Environmental Mitigation Trust (252 KB) |
MSC 18-01 | Public Workshop on Guidelines for the Clean Cars 4 All and Enhanced Fleet Modernization Programs (111KB) |
Emissions Compliance, Automotive Regulations and Science Division
Mailout # | Subject |
---|---|
ECARS 18-06 | Public Workshop Notice To Discuss Implementation Of The Electric Vehicle Charging Stations Open Access Act. (75KB) |
ECARS 18-05 | Format for Annual Production Volume Reports for Small Spark-Ignited Evaporative Families (PDF 343KB)
|
ECARS 18-04 | Reporting California Vehicle and Engine Production Numbers for Assessing Annual Certification Fees for Fiscal-Year 2018-2019 (FY18/19) (PDF 218KB)
|
ECARS 18-03 | Public Workshop Notice To Discuss Implementation Of The Electric Vehicle Charging Stations Open Access Act. (329KB) |
ECARS 18-02 | Public Workshop to Discuss the Modification of the Aftermarket Parts Exemption Procedures. (709KB) |
ECARS 18-01 | Mandatory and Voluntary Surveys for Fuel Cell-, Battery-, Plugin Hybrid-, Electric Vehicle Production Plans (PDF/271KB), Attachment 1: Hydrogen Station List (PDF/80KB), Attachment 2: Hydrogen Station Location Map (JPG/2MB), Attachment 3: Vehicle Class Definitions (PDF/33KB), Attachments 4,5 and 6: 2018 OEM Survey (Excel/2MB), Attachment 7: Station Location Worksheet (PDF/20KB), Attachment 8: CAFCP Station Location Letter (PDF/2MB), Attachment 9: PEV Infrastructure Contacts (PDF/16KB), Attachment 10: NE States Hydrogen (PDF/24KB) |
For Motor Vehicle Related Mailouts and Manufacturers' Advisory Correspondence (MACs) from 1996 and older, please contact the Webmaster.