Vapor Recovery Approval Letters NumberDescriptionDateEO14-03Franklin Fueling Systems and Veyance Technologies EVR certified low permeation replacement hoses required on assist Phase II EVR systems03/18/15VR-201, VR-202, VR-21010-05E.J. Ward, Inc. RF Nozzle Module, part# RF Hose Mod is approved for side mount installations for nozzles listed in table 1. However, it is not approved to be mounted on the left side of the Healy 900 or the 400 Phase II Vapor Recovery nozzles as it would block the vapor adjustment screw and breather hole located underneath the scuff guard02/08/11 10-02 E.J. Ward, Inc. RF Nozzle, part# RF Hose Mod is approved for use with the VST-EVR-NB Balance Phase II Vapor Recovery Nozzle and Healy 900 and 400 Phase II Vapor Recovery Nozzles06/15/10 10-01The Syn-Tech Systems Inc. RF/ID nozzle tag #941B0218-20 is approved for use with the VST-EVR-NB Balance Phase II Vapor Recovery Nozzle01/29/10 09-10The EMCO Wheaton EVR nozzle, safe break valve and hose swivel are now approved replacement components for pre-EVR balance systems11/19/09G-70-52-AM09-02As of June 15, 2009, only enchanced vapor recovery (EVR) Phase II components are the approved replacement components for balance Phase II vapor recovery systems06/02/09VR-203, VR-204, VR-205, G-70-52-AM08-04aHusky Model 5885 P/V Vent Valve will be the Required Replacement Valve Beginning October 1, 200809/26/08 08-03-CRoseman Engineering, LTD. Passive Nozzle Tag, also known as the MAXIMUS and AssetWorks FuelFocus Passive Nozzle Tag Approved for use with Listed Phase II Balance Vapor Recovery Nozzles06/01/09 08-01EVR-Certified Replacement Parts Required on November 1, 2008 for Balance Vapor Recovery Systems06/30/08G-70-52-AM07-09VST Phase II EVR Hanging Hardward Compatiblity Approval for Pre-EVR Vapor Recovery Systems11/27/07VR-203-A07-08Catlow CTMVA Cam Twist Breakaway Approval11/07/07G-70-204-A, G-70-20907-07Hill-Vac Vapor Recovery System for Cargo Tank Motor Vehicle Fueling System Approval11/07/07G-70-19307-06Innovative Petroleum Product (IPP) Semi-Rigid Piping Approval10/26/07-07-03Goodyear Maxxim Premier Plus Balance Hose Modification Approval08/06/07-07-01Nupi SuperSmartflex Piping Approval07/18/07-06-03-ATrak Engineering, Inc. Radio Nozzle Pickup Approved for use with the Healy Model 900, VST Model VST-EVR-NB and Emco-Wheaton A4005 Series Phase II Vapor Recovery Nozzle06/16/09-03-09Western Fiberglass Underground Flexible Piping Site Specific Approval4/23/03-03-08Kelly Meyer Associates Underground Flexible Piping Site Specific Approval4/23/03-03-05Total Containment Underground Flexible Piping Site Specific Approval4/23/03-03-04ORVR Compatibility of Phase II Balance Systems3/3/03-03-03Healy Model 807 Swivel Breakaway and Hose Assemblies4/2/03-03-02Syn-Tech Systems, Inc. RF/ID Nozzle Tag Part Numbers 941B0157 and 941B02204/21/03-02-14Flexible Connectors provide equivalent performance as Swing Joints12/3/02-02-13PetroTechnik's UPP vapor return piping for Phase II vapor recovery applications10/22/02-