Carl Moyer Program: Infrastructure Maximum Funding Limits
Contact
Email
Potential grant amounts for infrastructure projects under the Carl Moyer Program are funded based on the maximum percentage of eligible costs. A cost-effectiveness threshold is not required for infrastructure projects.
For more information about eligibility, see Chapter 10 of the Carl Moyer Program Guidelines.
Maximum Percentage of Eligible Cost(b) | Infrastructure Project |
---|---|
50% | All Projects |
60% | Publicly Accessible Projects |
65% | Projects with Solar/Wind Power Systems (a) |
75% | Publicly Accessible Projects with Solar/Wind Power Systems(a) |
100% | Public School Bus Projects(c) |
(a) At least 50 percent of the total energy provided to covered sources by the project must be generated from solar/wind
(b) Additional 5% funding available to applicants of heavy-duty truck parking facilities that provide communal charging opportunities (e.g., truck yards, truck depot, truck stops etc.)
(c) Also, may include solar/wind power systems.