Executive Order G-70-23
Contact
Executive Order G-70-23 Revision AC Recertification of the Exxon Balance Phase II Vapor Recovery System
For copies of documents related to the Executive Order, please contact vapor@arb.ca.gov for electronic copies.
Legal Language | |
Exxon Balance System Equipment List | |
Specifications for the Exxon Balance Phase II System | |
Exxon Balanced Vapor Recovery System | |
Exxon Balanced Vapor Recovery System | |
Static Pressure Integrity Test Underground Storage Tanks | |
"T" Connector Assembly | |
Vapor Coupler Integrity Assembly | |
Vapor Coupler Test Assembly | |
Pressure Decay Leak Rate Criteria: Initial Pressure of 2 inches of H2O, Minimum Pressure After 5 Minutes, Inches of H2O | |
Bay Area Air Quality Management District: Summary of Source Test Results | |
Gasoline Dispensing Facility Dynamic Back Pressure | |
Dynamic Back Pressure Test Assembly | |
Dynamic Pressure Release Assembly | |
Capped "T" Assembly | |
Summary of Source Test Results | |
Summary of Test Results: Dynamic Back Pressure, Inches of Water Column | |
Ten Gallon Per Minute Limitation Compliance Verification Procedure |
Executive Order G-70-23-AC
Modification of the Certification of Exxon Balance Phase II Vapor Recovery System
The above document is also available below in its 18 subparts:
The superseded version of the above document can be found by clicking on the link below:
Superseded Executive Order G-70-23-AB
Superseded Executive Order G-70-23-AA
Superseded Executive Order G-70-23-B
Superseded Executive Order G-70-23-A
Superseded Executive Order G-70-23