Executive Order G-70-186
Executive Order G-70-186
Certification of the Healy 400 ORVR Vacuum Assist Phase II Vapor Recovery System (PDF Format - 924K)
The above document is also available below in it's 27 subparts. For these documents or any other related to the Executive Order, please contact vapor@arb.ca.gov for electronic copies.
Legal Language | Legal Language (PDF Format 291K) |
Exhibit 1 | Healy Model 400 ORVR Nozzle System Equipment List (PDF Format - 7K) |
Exhibit 2 | Specifications for the Healy Model 400 ORVR Nozzle System (PDF Format - 32K) |
Exhibit 2 Figures | |
Figure 1 | Healy 400 ORVR Nozzle (PDF Format - 47K) |
Figure 2A | 9000-01 Mini-Jet Installation with Red Jacket Pump (PDF Format - 43K) |
Figure 2B | 9000-01 Mini-Jet Installation with FE Petro Pump (PDF Format - 53K) |
Figure 2C | 9000-02 Mini-Jet Installation with Red Jacket Pump (PDF Format - 44K) |
Figure 2D | 9000-01 Mini-Jet Installation with Red Jacket Pump (Dedicated STP) (PDF Format 40K) |
Figure 3 | VP500 Central Vacuum Vane Pump (Typical Sump Installation) (PDF Format 50K) |
Figure 4A | Healy Monitoring System Layout (PDF Format - 35K) |
Figure 4B | System Monitor Control Box (SMCB) (PDF Format - 42K) |
Figure 4C | 6299 Intrinsically Safe Module (PDF Format - 27K) |
Figure 4D | 93928 Vacuum Monitor Pressure Switch (PDF Format - 25K) |
Figure 4E | Vent Piping Detail (PDF Format - 22K) |
Figure 4F | Vent Manifold Assembly (PDF Format - 28K) |
Figure 4G | 6275 System Monitor Vent Sensor (PDF Format - 22K) |
Figure 5A | Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the Healy Model 9000 Mini-Jet Pump with Two-Point Phase I System (PDF Format 54K) |
Figure 5B | Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 55K) |
Figure 5C | Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 49K) |
Figure 5D | Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 48K) |
Figure 5E | Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K) |
Figure 5F | Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K) |
Figure 6 | Monitor Maintenance Log Sheet (PDF Format - 6K) |
Exhibit 3 | Static Pressure Integrity Test Underground Storage Tanks, Table 3-1 and Form 3-1 (PDF Format - 109K) |
Exhibit 4 | Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System (PDF Format - 9K) |
Exhibit 5 | Fillneck Vapor Pressure Regulation Fueling Test (PDF Format - 18K) |
Exhibit 6 | Ten Gallon Per Minute Limitation Compliance Verification Procedure (PDF Format - 5K) |