Executive Order G-70-183
| Executive Order G-70-183-AA | 
| Relating to Language Correction in Existing Executive Order G-70-183 (PDF Format - 453K) | 
| The above document is also available below in its 11 subparts. For these and any document listed, please contact vapor@arb.ca.gov for electronic copies. 
 | 
| 
 | Legal Language (PDF Format - 149K) | 
| 
 | Equipment List (PDF Format - 9K) | 
| 
 | Specifications for the Healy/Franklin System (PDF Format - 30K) | 
| 
 | Ten Gallon Per Minute Requirement (PDF Format - 6K) | 
| 
 | Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Manifolded Tanks and Three Non-Manifolded Vapor Vent Lines (PDF Format - 192K) | 
| 
 | Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with One Three Inch Diameter Vapor Vent Line (PDF Format - 152K) | 
| 
 | Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Three Manifolded Vapor Vent Lines (PDF Format - 189K) | 
| 
 | Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Remote Vapor Adapters and Three Manifolded Vapor Vent Lines (PDF Format - 196K) | 
| 
 | Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with One Two Inch Diameter Vapor Vent Line (PDF Format - 137K) | 
| 
 | Healy Model 600 Nozzle (PDF Format - 15K) | 
| 
 | Healy/Franklin Electric VP1000 Vapor Pump (PDF Format - 50K) | 
| The superseded version of the above document can be found by clicking on the link below: 
 |