Executive Order G-70-183
Executive Order G-70-183-AA |
Relating to Language Correction in Existing Executive Order G-70-183 (PDF Format - 453K) |
The above document is also available below in its 11 subparts. For these and any document listed, please contact vapor@arb.ca.gov for electronic copies.
|
| Legal Language (PDF Format - 149K) |
| Equipment List (PDF Format - 9K) |
| Specifications for the Healy/Franklin System (PDF Format - 30K) |
| Ten Gallon Per Minute Requirement (PDF Format - 6K) |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Manifolded Tanks and Three Non-Manifolded Vapor Vent Lines (PDF Format - 192K) |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with One Three Inch Diameter Vapor Vent Line (PDF Format - 152K) |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Three Manifolded Vapor Vent Lines (PDF Format - 189K) |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Remote Vapor Adapters and Three Manifolded Vapor Vent Lines (PDF Format - 196K) |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with One Two Inch Diameter Vapor Vent Line (PDF Format - 137K) |
| Healy Model 600 Nozzle (PDF Format - 15K) |
| Healy/Franklin Electric VP1000 Vapor Pump (PDF Format - 50K) |
The superseded version of the above document can be found by clicking on the link below:
|