Superseded VR-204 Revision Y
Superseded Executive Order VR-204-Y
Balance Phase II Enhanced Vapor Recovery System Including In-Station Diagnostics (ISD)
Modification Highlights
For associated Exhibits, IOMs, and letters listed below, email vapor@arb.ca.gov for current versions:
| Legal Document | |
Exhibit 1 | Equipment List |
Exhibit 2 | System Specifications |
Exhibit 3 | Manufacturing Performance Specifications and Warranties |
Exhibit 4 | Required Items in Conducting TP-201.3 |
Exhibit 5 | Liquid Removal Test Procedure |
Exhibit 6 | Required Items For Conducting TP-201.4 |
Exhibit 7 | Nozzle Bag Test Procedure |
Exhibit 8 | VST ECS; Hydrocarbon Sensor Verification Test Procedure |
Exhibit 9 | VST ECS; Determination of Processor Activation Pressure |
Exhibit 10 | Veeder-Root; Vapor Pressure Sensor Verification Test Procedure |
Exhibit 11 | Veeder-Root Vapor Polisher; Operability Test Procedure |
Exhibit 12 | Veeder-Root Vapor Polisher; Hydrocarbon Emissions Verification Test Procedure |
Exhibit 13 | Hirt VCS 100 Processor with Indicator Panel Operability Test Procedure |
Exhibit 14 | Franklin Fueling Systems Healy Clean Air Separator; Static Pressure Performance Test Procedure |
Exhibit 15 | VST Green Machine Compliance Test Procedure |
Exhibit 16 | Liquid Condensate Trap Compliance Test Procedure |
Exhibit 17 | Veeder-Root; ISD Vapor Flow Meter Operability Test Procedure |
Exhibit 18 | Veeder-Root Maintenance Tracker |
Exhibit 19 | INCON Flow Meter Operability Test Procedure |
Exhibit 20 | INCON PRessure Sensor Operability Test Procedure |
Installation, Operation and Maintenance Manual (IOM)
| Contractor Requirements | |
| Weekly Inspections | |
| Annual Inspections | |
| Alarm Troubleshooting Summary | |
| Drive-offs and Other Customer Abuse | |
| Phase II Coaxial Balance EVR Dripless Nozzles | |
| Phase II Coaxial EVR Nozzle Repair Kits | |
| Phase II Coaxial EVR Balance Fuel Hose | |
| Phase II Coaxial EVR Balance Safety Breakaway Device | |
| VST ECS Membrane Processor: Installation | |
| VST ECS Membrane Processor: Operation, Maintenance, & Start-Up | |
| Veeder-Root: ISD Installation Manual | |
| Veeder-Root ISD/ VST ECS Membrane Processor/ Veeder-Root Vapor Polisher: Pressure Sensor Installation Guide | |
| Veeder-Root Vapor Polisher: Installation | |
| Veeder-Root ISD: Flow Meter Installation Guide | |
| Hirt VCS 100 Vapor Processor and Indicator Panel Installation Manual | |
| Healy Clean Air Separator Installation Guide | |
| VST Green Machine Installation and Maintenance Manual | |
| Veeder-Root TLS RF Wireless 2 System: Installation and Maintenance Guide. | |
| Liquid Condensate Trap: Installation, Operations, and Maintenance Manual | |
| INCON VRM Operator Guide | |
| INCON VFM Install Guide | |
| INCON VPS Install Guide | |
| INCON DTU Console Side Install | |
| INCON DTU Dispenser Retrofit Install | |
| INCON Thermal Printer Install Retrofit | |
| Veeder-Root Vapor Pressure Sensor Vent Stack Install |