Superseded Executive Order G-70-150-AD
Superseded Executive Order G-70-150-AD
Modification of the Certification of the Gilbarco VaporVac Phase II Vapor Recovery System (Acrobat 818K)
The above document is also available below in its 16 subparts:
Legal | Legal Language (Acrobat 78K) |
Exhibit 1 | Equipment List (Acrobat 31K) |
Figure 1A | OPW Model 11VAI-xx Nozzle (Acrobat 50K) |
Figure 1B | Husky Model V3-6201xxx Nozzle (Acrobat 26K) |
Figure 1C | Emco Wheaton Model A4500 Nozzle (Acrobat 59K) |
Exhibit 2 | Specifications for the VaporVac Bootless Nozzle System (Acrobat 25K) |
Figure 2A-1 | Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 57K) |
Figure 2A-2 | Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 47K) |
Figure 2A-3 | Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 52K) |
Figure 2A-4 | Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 52K) |
Figure 2B-1 | Component Parts of the VaporVac System (Acrobat 66K) |
Figure 2B-2 | VaporVac Dispenser Types (Acrobat 234K) |
Exhibit 3 | Static Pressure Integrity Test Underground Storage Tanks (Acrobat 132K) |
Table 3-1 | Pressure Decay Leak Rate Criteria (Acrobat 8K) |
Form 3-1 | Summary of Source Test Results (Acrobat 14K) |
Exhibit 4 | Ten Gallon Per Minute Requirement (Acrobat 8K) |