Executive Order G-70-163
Executive Order G-70-163-AA
Modification to the Certification of the OPW VaporEZ Phase II Vapor Recovery System.
The above document is also available below in it's 14 subparts. For copies of the listed documents, please email vapor@arb.ca.gov for electronic copies:
Legal | Legal & Exhibit 1 Legal, Equipment List & Specifications |
Figure 1A | OPW Model 11VAI-XX Nozzle |
Figure 1B | Blackmer Model VRFO Vapor Pump Assembly Options |
Figure 1C | Dispenser Configurations Approved for use with the VaporEZ System |
Exhibit 2 | Specifications for the Vapor EZ Bootless Nozzle System |
Figure 2A | Component Parts of the VaporEZ System |
Figure 2B-1 | Typical Installation of the OPW VaporEZ Phase II Vapor Recovery System with Two-Point Phase I System |
Figure 2B-2 | Typical Installation of the OPW VaporEZPhase II Vapor Recovery System with Two-Point Phase I System |
Figure 2B-3 | Typical Installation of the OPW VaporEZPhase II Vapor Recovery System with Two-Point Phase I System |
Figure 2B-4 | Typical Installation of the OPW VaporEZ Phase II Vapor Recovery System with Two-Point Phase I System |
Exhibit 3 | Leak Decay Test |
Table 3-1 | Pressure Decay Leak Rate Table |
Form 3-1 | Summary of Source Test Results |
Exhibit 4 | Ten Gallon Per Minute Requirement |
The superseded version of the above document can be found by clicking on the link below:
Superseded Executive Order G-70-163