VR 202 - Assist Phase II Enhanced Vapor Recovery System Including ISD
Contacto
VR 202 Assist Phase II Vapor Recovery System Including ISD - Revision AE (Renewed November 30, 2023)
- Signed Executive Order VR-201-AE
Exhibit 1 | Equipment List |
Exhibit 2 | System Specifications |
Exhibit 3 | Manufacturing Performance Standards and Specifications |
Determination of Static Pressure Performance of the Healy Clean Air Separator | |
Vapor to Liquid Volume Ratio | |
Exhibit 6 | Manufacturer Warranties |
Nozzle Bag Test Procedure | |
Exhibit 8 | Required Items in Conducting TP-201.3 |
Exhibit 9 | Veeder-Root ISD Operability Test Procedure |
Exhibit 10 | FFS INCON ISD Operability Test Procedure |
Exhibit 11 | Liquid Condensate Trap Compliance Test Procedure |
Exhibit 12 | Veeder-Root Maintenance Tracker (Optional) |
Exhibit 13 | Below-Grade Vaulted Tank Configuration |
Exhibit 14 | Dispenser Integrity Test |
Exhibit 15 | ARID Technologies AT-150 Permeator Compliance Test Procedure |
Installation, Operation and Maintenance Manual (IOM)
Full IOM VR-202-AE Download
Until documents have been posted, please contact vapor@arb.ca.gov for electronic versions
Superseded
Assist Phase II Enhanced Vapor Recovery System
Executive Order VR-202-AD
Equipment List | |
System Specifications | |
Manufacturing Performance Standards and Specifications | |
Determination of Static Pressure Performance of the Healy Clean Air Separator | |
Vapor to Liquid Volume Ratio | |
Manufacturer Warranties | |
Nozzle Bag Test Procedure | |
Required Items in Conducting TP-201.3 | |
Veeder-Root ISD Operability Test Procedure | |
FFS INCON ISD Operability Test Procedure | |
Liquid Condensate Trap Compliance Test Procedure | |
Veeder-Root Maintenance Tracker (Optional) | |
Below-Grade Vaulted Tank Configuration | |
Dispenser Integrity Test | |
ARID Technologies AT-150 Permeator Compliance Test Procedure |
Installation, Operation and Maintenance Manual (IOM)
Full IOM VR-202-AC Download
Superseded Rev AB
Executive Order VR-202-AB
Equipment List | |
System Specifications | |
Manufacturing Performance Standards and Specifications | |
Determination of Static Pressure Performance of the Healy Clean Air Separator | |
Vapor to Liquid Volume Ratio | |
Manufacturer Warranties | |
Nozzle Bag Test Procedure | |
Required Items in Conducting TP-201.3 | |
Veeder-Root ISD Operability Test Procedure | |
FFS INCON ISD Operability Test Procedure | |
Liquid Condensate Trap Compliance Test Procedure | |
Veeder-Root Maintenance Tracker (Optional) | |
Below-Grade Vaulted Tank Configuration | |
Dispenser Integrity Test | |
ARID Technologies AT-150 Permeator Compliance Test Procedure |
Installation, Operation and Maintenance Manual (IOM)
Full IOM VR-202-AB Download
Superseded Revisions:
Superseded VR-202-Rev Z
Superseded VR-202-Rev Y
Superseded VR-202-Rev X
Superseded VR-202-Rev W
- For revisions A through V, please email vapor@arb.ca.gov
CARB Letters
Alternate Potting Compound for Franklin Fueling Systems Vapor Flow Meter
April 8, 2016 Letter to Franklin Fueling Systems (FFS) allowing for an alternate potting compound for FFS INCON In-Station Diagnostic System (ISD) vapor flow meter.
March 18, 2015 Letter to Franklin Fueling Systems and Veyance Technologies requiring the use of EVR certified low permeation replacement hoses for Assist Phase II EVR systems.
Fillboard Nozzle Advertising Product
August 1, 2012 Letter to allow over media for Healy 900 nozzles
New EasyGrip Reconnection Clamp
July 14, 2011 Letter to GA Ninety to use the EasyGrip reconnection clamp to reconnect the Healy 8701VV Breakaway
Modified Healy 795 Reconnection Clamp
June 22, 2011 Letter to Franklin Fueling Systems to implement design change to the Healy 795 Reconnection Clamp
Franklin Fueling Systems Request for Spout Modification, New Spout Epoxy and Epoxy Curing Procedure.
JUR Annunciator Remote Audio and Visual Alarm Component
Franklin Fueling Systems Request to Use New Vendor for Their Model 900 EVR Nozzle Casting
VP-1000 Design Improvements
September 18, 2007 Letter to Franklin Fueling Systems to implement VP-1000 design improvements.
Clean Air Separator Paint Colors
August 2, 2007 letter clarifying that the Healy Clean Air Separator may be painted any color.
Correspondence related to VR-202
April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law.