Executive Order G-70-175
Hasstech VCP-3A Vacuum Assist Phase II Vapor Recovery System for Aboveground Tank Systems (PDF Format 2,156K)
The above document is also available below in it's 17 subparts:
| Legal Language (PDF Format 336K) | |
| Hasstech VCP-3A System Equipment List (PDF Format 115K) | |
| Specifications for the Hasstech VCP-3A System (PDF Format 1320K) | |
| Exhibit 2 Figures | |
| Aboveground Tank V/R Installation (Typical) (PDF Format 85K) | |
| AST V/R Piping Schematic (Typical) (PDF Format 102K) | |
| Vapor Recovery Piping Schematic (Typical) (PDF Format 113K) | |
| Out of Tank Drain Check (PDF Format 49K) | |
| Automatic Low Point Liquid Clearing Device (Typical) (PDF Format 55K) | |
| Processing Unit (PDF Format 33K) | |
| Collection Unit Detail (PDF Format 42K) | |
| Control Panel (PDF Format 38K) | |
| Tank Pressure Switch (PDF Format 57K) | |
| Standard Installation (PDF Format 47K) | |
| Multi-Product Dispenser Installation (PDF Format 43K) | |
| OPW 11VAI Nozzle, Emco Wheaton A4500 Nozzle and the Husky V34 6200-8 Nozzle (PDF Format 80K) | |
| Static Pressure Integrity Test Above Ground Storage Tanks (PDF Format 388K) | |
| Exhibit 3 Figures | |
| Vent Pipe Pressure Assembly (PDF Format 36K) | |