Superseded VR-201-W
Assist Phase II Enhanced Vapor Recovery System
Modification Highlights
Executive Order VR-201-W
Full VR-201-W Download
| Legal Document | |
| Equipment List | |
| System Specifications | |
| Manufacturing Performance Standards and Specifications | |
| Determination of Static Pressure Performance of the Healy Clean Air Separator | |
| Vapor to Liquid Volume Ratio | |
| Manufacturer Warranties | |
| Nozzle Bag Test Procedure | |
| Required Items in Conducting TP-201.3 | |
| Liquid Condensate Trap Compliance Test Procedure | |
| This section left intentionally blank |
| This section left intentionally blank |
| Veeder-Root Maintenance Tracker (Optional) | |
| Below-Grade Vaulted Tank Configuration |
Installation, Operation and Maintenance Manual (IOM)
Full IOM VR-201-W Download
| Table of Contents | |
| Scheduled Maintenance | |
| Nozzle | |
| Clean Air Separator Pressure Management System | |
| Inverted Coaxial Hoses | |
| Hose Adaptors | |
| Re-connectable Breakaway Couplings | |
| Flow Limiters | |
| Dispensers with Healy Model VP1000 Vacuum Pump | |
| Liquid Condensate Trap |