Balance Phase II Enhanced Vapor Recovery System including In-Station Diagnostics (ISD) - [VR-204 Revision AF]
Contacto
Executive Order VR-204-AF
Number | Exhibit Title |
|---|---|
Equipment List | |
System Specifications | |
Manufacturing Performance Standards and Warranties | |
Required Items in Conducting TP-201.3 | |
Liquid Removal Test Procedure | |
Required Items for Conducting TP-201.4 | |
Nozzle Bag Test Procedure | |
VST ECS - Hydrocarbon Sensor Verification Test Procedure | |
VST ECS - Determination of Processor Activation Pressure | |
Veeder-Root - Vapor Pressure Sensor Verification Test Procedure | |
Veeder-Root Vapor Polisher - Operability Test Procedure | |
Veeder-Root Vapor Polisher - Hydrocarbon Emissions Verification Test Procedure | |
Hirt VCS 100 - Processor Operability Test Procedure | |
Franklin Fueling System (FFS) Healy Clean Air Separator - Determination of Static Pressure Performance | |
VST Green Machine - Compliance Test Procedure | |
Liquid Condensate Trap Compliance Test Procedure | |
Veeder-Root - ISD Vapor Flow Meter Operability Test Procedure | |
Veeder-Root Maintenance Tracker (Optional) | |
INCON Flow Meter Operability Test Procedure | |
INCON Pressure Sensor Operability Test Procedure | |
Below-Grade Vaulted Tank Configuration |
Installation, Operation and Maintenance Manual (IOM)
For current version of CARB approved individual IOMs, please email [email protected].
For reference, IOM title with corresponding number are listed below:
Number | IOM Title |
|---|---|
IOM 1 | Contractor Requirements |
IOM 2 | Weekly Inspections |
IOM 3 | Quarterly and Annual Inspections |
IOM 4 | Alarm Troubleshooting Summary |
IOM 5 | Drive-offs and Other Customer Abuse |
IOM 6 | Phase II Coaxial Balance EVR Dripless Nozzles |
IOM 7 | Phase II Coaxial EVR Nozzle Repair Kits |
IOM 8 | Phase II Coaxial EVR Balance Fuel Hose |
IOM 9 | Phase II Coaxial EVR Balance Safety Breakaway Device |
IOM 10 | VST ECS Membrane Processor: Installation |
IOM 11 | VST ECS Membrane Processor: Operation, Maintenance, & Start-Up |
IOM 12 | Veeder-Root - ISD Installation, Setup, and Operation
|
IOM 13 | Veeder-Root Vapor Pressure Sensor Installation |
IOM 14 | Veeder-Root Vapor Polisher: Installation |
IOM 15 | Veeder-Root - ISD Flow Meter Installation |
IOM 16 | Hirt VCS 100: Vapor Processor and Indicator Panel Installation |
IOM 17 | Healy Clean Air Separator: Installation |
IOM 18 | VST Green Machine Installation and Maintenance |
IOM 19 | Veeder-Root TLS RF Wireless 2 System: Installation and Maintenance |
IOM 20 | Liquid Condensate Trap: Installation, Operations, and Maintenance |
IOM 21 | Veeder-Root Vapor Pressure Sensor for Vent Stack: Installation Guide |
IOM 22 | INCON VRM Operator Guide |
IOM 23 | INCON VFM Install Guide |
IOM 24 | INCON VPS Install Guide |
IOM 25 | INCON DTU Console Side Install |
IOM 26 | INCON DTU Dispenser Retrofit Install |
IOM 27 | INCON Thermal Printer Install Retrofit |
Superseded Revisions
For copies of superseded executive orders and individual IOMs and superseded versions, please contact [email protected].