Assist Phase II Enhanced Vapor Recovery System including In-Station Diagnostics (ISD) - [VR-202 Revision AH]
Contact
Executive Order VR-202-AH
Number | Exhibit Title |
|---|---|
Equipment List | |
System Specifications | |
Manufacturing Performance Standards and Specifications | |
Determination of Static Pressure Performance of the Healy Clean Air Separator | |
Vapor to Liquid Volume Ratio | |
Manufacturer Warranties | |
Nozzle Bag Test Procedure | |
Required Items in Conducting TP-201.3 | |
Veeder-Root ISD Operability Test Procedure | |
Franklin Fueling System (FFS) INCON ISD Operability Test Procedure | |
Liquid Condensate Trap Compliance Test Procedure | |
Veeder-Root Maintenance Tracker (Optional) | |
Below-Grade Vaulted Tank Configuration | |
Dispenser Integrity Test | |
ARID Technologies AT-150 Permeator Compliance Test Procedure |
Installation, Operation and Maintenance Manual (IOM)
For current version of CARB approved individual IOMs, please email [email protected].
For reference, IOM title with corresponding number are listed below:
Number | IOM Title |
|---|---|
IOM 1 | Scheduled Maintenance |
IOM 2 | EVR Nozzles |
IOM 3 | Healy Clean Air Separator (CAS) |
IOM 4 | Coaxial Hoses |
IOM 5 | Hose Adaptors |
IOM 6 | Breakaways |
IOM 7 | Flow Limiter |
IOM 8 | Dispensers Retrofit |
IOM 9 | Liquid Condensate Trap (LCT) |
IOM 10 | Veeder-Root ISD |
IOM 11 | INCON ISD |
IOM 12 | ARID Permeator |
Superseded Revisions
For copies of superseded executive orders and individual IOMs and superseded versions, please contact [email protected].