Asbestos Monitoring During Pile Removal Project
This page last reviewed May 20, 2015
Table 6
Measured Ambient Asbestos Concentrations
Asbestos Monitoring During Pile Removal Project
Detailed Listing
(Updated May 12, 2000)
Location Name
|
Geographical Area / City
|
Sampling Dates
|
Concentration
(fibers per cc)
|
|
|
|
Measured
|
MDL1
|
|
East
|
Woedee Drive
|
02/08/00
|
ND
|
0.0007
|
|
02/09/00
|
ND
|
0.0009
|
|
North
|
Woedee Drive
|
02/08/00
|
ND
|
0.0007
|
|
02/09/00
|
ND
|
0.0009
|
|
South
|
Woedee Drive
|
02/08/00
|
ND
|
0.0008
|
|
02/09/00
|
ND
|
0.0008
|
|
West
|
Woedee Drive
|
02/08/00
|
ND
|
0.0008
|
|
02/09/00
|
ND
|
0.0008
|
NOTES:
MDL - Minimum Detection Limit
ND - No Asbestos Detected
Asbestos Air Monitoring