SHASTA COUNTY AIR QUALITY MANAGEMENT DISTRICT
RULE 3:29 - MUNICIPAL SOLID WASTE LANDFILLS
(Adopted 2/25/97, Effective 4/1/97)
A. Purpose:
The purpose of this rule is to limit non-methane organic compound (NMOC) emissions from municipal solid waste (MSW)
landfills by implementing the provisions of Title 40 Code of Federal Regulations (CFR) Part 60, Subpart Cc-Emission
Guidelines and Compliance Times for MSW Landfills.
B. Applicability:
- This rules applies to all MSW landfills meeting the following conditions:
- construction, reconstruction or modification was commenced before May 30, 1991; and
- the MSW landfill has accepted waste at any time since November 8, 1987, or has additional design capacity available
for future waste deposition.
C. Definitions:
Terms used but not defined in this rule have the meaning given them in 40 CFR Part 60.751 (Definitions) except:
- Administrator, for the purposes of this rule, means Air Pollution Control Officer (APCO) of the Shasta County
Air Quality Management District, except that the APCO shall not be empowered to approve:
- alternative or equivalent test methods, alternative standards; or
- alternative work practices unless included in the site-specific design plan as provided in 40 CFR Section 60.752(b)(2)(i).
- Design plan or plan means the site-specific design plan for the gas collection and control system submitted
under section E.3 of this rule
D. Effective Date:
The effective date of this rule shall be April 1, 1997.
E. Standards:
- Each owner or operator of a MSW landfill that has a design capacity equal to or greater than 2.5 million megagrams
or 2.5 million cubic meters, and a non-methane organic compound (NMOC) emission rate of 50 megagrams per year or
more, as calculated pursuant to 40 CFR 60.754 (Test Methods and Procedures) shall install a collection and control
system meeting the conditions provided in 40 CFR 60.752(b)(2)(ii) and (iii).
- The owner or operator of each MSW landfill shall submit an initial design capacity report and amended design
capacity report as specified in 40 CFR 60.752 (Standards for Air Emissions from MSW Landfills). Any density conversions
shall be documented and submitted with the report.
- The owner or operator shall submit a site-specific collection and control system design plan to the APCO as
provided under 40 CFR 60.752(b)(2)(i).
- The design plan shall include any alternatives to the operational standards, test methods, procedures, compliance
measures, monitoring, recordkeeping or reporting provisions of 40 CFR 60.753 through 60.758.
- The APCO shall review and either approve or disapprove the plan, or request that additional information be
submitted. The design plan shall either conform with specifications for active collection systems in 40 CFR 60.759
or include a demonstration to the APCO's satisfaction of the sufficiency of the alternative provisions to 40 CFR
60.759. The design plan may include alternatives as specified in 40 CFR 60.752(b)(2)(B).
- Each MSW landfill required to install a gas collection and control system under this section shall meet the
operational standards in 40 CFR 60.753; the compliance provisions in 40 CFR 60.755 and the monitoring provisions
in 40 CFR 60.756, except that the APCO may approve alternatives in the design plan as provided in section E.5 of
this rule.
F. Recordkeeping And Reporting Requirements:
The owner or operator of each MSW landfill shall meet the recordkeeping and reporting requirements of 40 CFR 60.757
and 40 CFR 60.758, as applicable, except that the APCO may approve alternative recordkeeping and reporting provisions
as provided in section E.5 of this rule. Any records or reports required to be submitted pursuant to 40 CFR 60.757
OR 40 CFR 60.758 shall be submitted to the APCO.
G. Compliance Schedule:
- The design capacity and the NMOC emissions reports required pursuant to 40 CFR 60.752 and 40 CFR 60.754 shall
be submitted within ninety (90) days of the effective date of this rule.
- The site-specific collection and control system design plan required under section E.3. of this rule shall
be submitted within one (1) year after determining that the MSW landfill has a NMOC emission rate equal to or greater
than fifty (50) megagrams per year.
- The planning, awarding of contracts, and installation of the collection and control equipment required pursuant
to section E.1. of this rule shall be accomplished within thirty (30) months after the effective date of this rule.
- The initial performance test of the collection and control system equipment shall be accomplished within six
(6) months of control system startup.