NORTHERN SONOMA COUNTY AIR POLLUTION CONTROL DISTRICT
RULE 310 - PERMIT FEE SCHEDULES
It is hereby determined that the cost of reviewing permit applications, issuing authorizations, and of inspections,
testing and monitoring pertaining to such issuance, exceeds the fees prescribed herein. In determining the fees
to be charged, identical or like equipment within each process unit that requires a permit may be totaled for each
schedule. In the event that more than one fee schedule is applicable to an Authority to Construct or Permit to
Operate, the governing schedule shall be that which results in the highest fee. A CPI fee adjustment factor may
be applied to the initial fee with 1992 as base year.
SCHEDULE 1
ELECTRIC MOTOR HORSEPOWER SCHEDULE
Any stationary source of air contaminant emissions
for which an Authority to Construct or a Permit to Operate is required, where an electric motor or equivalent drive
unit is used as the power supply, shall be assessed a permit fee based on the total rated horsepower of all such
drive units, or their horsepower equivalent in kilovolt amperes (1 KVA=1.34 HP), included in such stationary source
in accordance with the following schedule. INITIAL FEE
ANNUAL RENEWAL
$ 85.60
$ 42.80
$ 117.70
$ 58.85
$288.90
$ 144.45
$577.80
$288.90
$866.70
$ 433.35
$1,144.90
$572.45
HORSEPOWER
Less than 25
25 or greater but less than 50
50 or greater but less than 100
100 or greater but less than 300
300 or greater but less than 1,000
1,000 or greater
SCHEDULE 2
FUEL BURNING AND POWER GENERATION EQUIPMENT SCHEDULE
Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is
required, in which fuel may at any time be burned or in which power may be generated, with the exception of incinerators
or refuse burners which are covered in Schedule 3, shall be assessed a permit fee based upon its rated design capacity
of heat input expressed in millions of British Thermal Units (BTU) per hour, using gross heating value of the fuel
or its equivalent, in accordance with the following schedule:
MILLION BRITISH THERMAL UNITS |
INITIAL FEE |
ANNUAL RENEWAL |
up to 0.50 |
$ 117.70 |
$ 58.85 |
0.50 or greater but less than 1.0 |
$ 288.90 |
$ 144.45 |
1.0 or greater but less than 5 |
$ 577.80 |
$ 288.90 |
5 or greater but less than 20 |
$ 729.74 |
$ 364.87 |
20 or greater but less than 50 |
$ 1,380.30 |
$ 690.15 |
50 or greater but less than 100 |
$ 1,671.34 |
$ 835.67 |
100 or greater but less than 250 |
$ 2,229.88 |
$ 1,114.94 |
250 or greater |
$ 5,574.70 |
$ 2,787.35 |
Any stationary source of air contaminant emissions,
for which an Authority to Construct or Permit to Operate is required, for the disposal of approved combustibles
by burning, shall be assessed a permit fee based on the maximum horizontal inside cross sectional area of the primary
combustion chamber, in accordance with the following schedule. INITIAL FEE
ANNUAL RENEWAL
$ 85.60
$ 42.80
$ 117.70
$ 58.85
$ 288.90
$ 144.45
$ 545.70
$272.85
$ 856.00
$ 428.00
$1,070.00
$535.00
AREA, SQUARE FEET
Less than 12
12 or greater but less than 100
100 or greater but less than 400
400 or greater but less than 1,000
1,000 or greater but less than 3
3,000 or greater
SCHEDULE 4
STATIONARY CONTAINER SCHEDULE
INITIAL FEE
ANNUAL RENEWAL
NSPS RENEWAL
$ 42.80
$ 21.40
$ 21.40
$ 139.10
69.55
69.55
$ 214.00
107.00
160.50
$ 256.80
181.90
321.00
Any stationary tank, reservoir, or other container for which an Authority to Construct or Permit to Operate is
required, shall be assessed a permit fee based on capacities in gallons or cubic equivalent, in accordance with
the following schedule. An annual renewal fee shall not be assessed for this equipment category, except for sources
which are subject to compliance with federal new source performance standards.
GALLONS
250 or greater but less than 4,000
4,000 or greater but less than 40,000
40,000 or greater but less than 400,000
400,000 or greater
SCHEDULE 5
PROCESS WEIGHT SCHEDULE
INITIAL FEE
ANNUAL RENEWAL
$ 117.70
$ 58.85
$ 288.90
$ 144.45
$577.80
$ 288.90
$866.70
$ 433.35
$1,433.80
$ 716.90
$1,968.80
$ 1,005.80
$2,878.30
$ 1,439.15
Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is
required, shall be assessed a permit fee based upon the maximum process weight rate calculated in pounds per hour.
MAXIMUM POUNDS PER
HOUR
less than 5,000
5,000 or greater but less than 20,000
20,000 or greater but less than 50,000
50,000 or greater but less than 100,000
100,000 or greater but less than 200,000
200,000 or greater but less than 400,000.
400,000 or greater
SCHEDULE 6
MISCELLANEOUS SCHEDULE
Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee based upon the volumetric exhaust rate from the source, expressed in actual cubic feet per minute.
VOLUME EXHAUSTED(CFM) |
INITIAL FEE |
ANNUAL RENEWAL |
up to and including 2,000 |
$ 85.60 |
$ 42.80 |
2,000 or greater but less than 5,000 |
$ 117.00 |
$ 58.85 |
5,000 or greater but less than 20,000 |
$ 181.90 |
$ 144.45 |
20,000 or greater but less than 50,000 |
$ 577.80 |
$ 288.90 |
50,000 or greater but less than 100,000 |
$ 1,166.30 |
$ 583.15 |
100,000 or greater but less than 200,000 |
$ 2,300.50 |
$ 1,150.25 |
200,000 or greater |
$ 2,814.10 |
$1,407.05 |
Any stationary source of air contaminant emissions
relative to the production or utilization of geothermal steam, for which an Authority to Construct or Permit to
Operate is required shall be assessed a permit fee in accordance with the following schedule. INITIAL FEE
ANNUAL RENEWAL
$ 706.20
$ 353.10
$ 107.00
$ 53.50
$11,342.00
$ 5,671.00
$ 2,600.00
$ 1,300.00
$1,500.00
$750.00
$400.00
$200.00
$2,814.10
$1,407.05
$750.00
$375.00
GEOTHERMAL SOURCES
Geothermal Well
Geothermal Well Air Pollution Control Device
Power Plant Unit (PPU)
Power Plant Modification
Power Plant Minor Modification
Geo. Steamfield Maintenance, per PPU
Geo. Well Steam Transmission Line
Geo. Well Steam Trans Line Modification
SCHEDULE 8
MAJOR SOURCE FEE SCHEDULE
ANNUAL RENEWAL FEE
$ 0.00
$26.75 per ton
$ 107,000.00
Any stationary source of regulated air contaminant emissions, for which an Authority to Construct or Permit to
Operate is required, shall be assessed a permit fee based upon the annual average emissions, calculated in tons
per year. As used in this paragraph, the term regulated air contaminant shall mean (1) a volatile organic compound;
(2) each pollutant regulated under New Source Performance Standards or National Emission Standards for Hazardous
Air Pollutants and (3) each pollutant for which a National primary Ambient Air Quality Standard has been promulgated
(except carbon monoxide).
TONS PER YEAR
Less than 10
10 or greater but less than 4000
4000 or greater