MOTOR VEHICLE POLLUTION CONTROL BOARD
REPORT OF THE COMMITTEE ON TEST PROCEDURES AND THEIR EVALUATION
Room 704
217 W. First Street
Los Angeles, CA
October 14, 1964
8:30 a.m.
AGENDA
1. Consideration of "Authorization" of Laboratories.
2. New Car Factory Installation Procedure.
Applicability of criteria:
(h) fuel consumption, and vehicle performance.
(j) odor, noise, oxides of nitrogen and aldehydes with
and without the device.
These are all comparative tests. With factory built-in systems
where the entire vehicle is new, no comparison exists. In the
case of each of these, there is no industry standard, one model
varying greatly from the next.
3. Detroit Testing Proposal
a. Emission Evaluation Basis.
b. Test Fleet Coverage.